Sunday, October 7, 2012

Pile it on

 
This wood was bought and dug out of the snow by me and Mona.  Brought to CF in the van and unloaded and stacked in the garage.  Then it was moved behind the garage and stacked again and now moved up the hill and stacked once more.  Pretty interesting right. 
 
 











The finish?

 
Just a few little more touches then wait till spring.
 






Thursday, September 20, 2012

The Great Wall of Cannon

Done alone and by hand.  Dirt will settle for the winter. 24 feet long 7 high and approx 11 deep.
 



























 


Tuesday, August 28, 2012

Rock of ages

The  CF property is located on a sandstone base which is covered by a little black dirt and some sand.  So peel back the top just a little and there it is.  Sandstone with time and enormous pressure finally emerges as quartz and quartzite over 1000's of years.  In between it also produced the limestone blocks that made this wall and many others in the Cannon Falls area.  6 or 7 trips to limekiln hill produced what Dad designed and what I modified.  Add acid wash and sitting with a wire brush and electric drill for a week or so that was needed to clean the face and....now just shovel out the topsoil and prepare a grade for next year when I bring 5 tons of Chilton flagstone, at our place in MG, down and set a patio.